Sweetgreen Now Open in Long Beach
- JDECFS

- Jan 20
- 2 min read
On January 20, 2026, Sweetgreen officially opened the doors to its newest location in Long Beach, California—the result of a tenant improvement project that began on August 11, 2025. JDE Construction & Facility Solutions (JDECFS) proudly served as the General Contractor, transforming an existing space into a complete Sweetgreen location and bringing the brand’s vision to life.
Supporting Sweetgreen Across Locations
At JDECFS, our work goes beyond individual build-outs. We offer comprehensive construction services, including tenant improvement (TI) projects, alongside ongoing facility maintenance and repair services. Sweetgreen is one of our valued long-term clients, and in addition to their brand new Long Beach location, we regularly support maintenance needs at other Sweetgreen locations.
This project highlights the strength of our partnership and our ability to support clients from initial construction through long-term facility operations. We value our work with Sweetgreen and are proud to support a location that will make a positive impact in the Long Beach community.
Bringing Sweetgreen’s Vision to Life
For the Sweetgreen Long Beach project, we focused on converting an existing building into a modern, high-performing restaurant that aligns seamlessly with Sweetgreen’s brand standards and operational requirements.
The scope of work included a full interior tenant improvement build-out, along with key upgrades and enhancements throughout the space:
Saw cutting, trenching, and removal of existing concrete
Installation of all underground utilities and plumbing
Framing
Drywall installation and painting
T-bar ceiling grid installation
Flooring installation throughout the store, including EcoGrip flooring
Door and hardware installation
Mechanical system installation
Retention of two existing rooftop units (RTUs) and replacement of one RTU
Exterior wood shiplap installation
Electrical work supporting Sweetgreen’s illuminated exterior signage
Coordination and installation of a brand-new IK automated salad-making machine
These upgrades, combined with Sweetgreen’s signature exterior finishes, completed the clean, welcoming look of the Long Beach location.
Built for a Valued Partner
The Sweetgreen Long Beach project is a strong example of how at JDE Construction & Facility Solutions, we support national brands through both high-quality construction services and reliable, ongoing facility maintenance. From initial build-out to long-term operational support, our team delivers consistency, efficiency, and results that our clients can depend on.
We’re proud to partner with Sweetgreen on this project and look forward to continuing our relationship by supporting their operations as they grow.

Comments